Quality
Quality Assurance in Steel Detailing
Errors in detailing are expensive in the shop and on site. Our checking process is built to catch them before information is released.
Three levels
Checked Three Times Before It Leaves Us
LEVEL 01
Detailing
Model and drawings created according to approved project standards.
LEVEL 02
Technical Review
Senior detailer reviews model, connections, dimensions and documentation.
LEVEL 03
Final QA/QC
Independent checker validates the deliverables before client submission.
Checklist
What Every Package Is Checked Against
A consistent checklist is applied to each submission so nothing depends on individual memory.
- Geometry
- Member sizes
- Connections
- Bolts
- Welds
- Plates
- Dimensions
- Levels
- Piece marks
- Drawing references
- BOM/MTO
- Revisions
- Client standards
- Fabrication outputs
From model to fabrication
Have a Steel Project Coming Up?
Send us your drawings, project requirements and target schedule. Our team will review the scope and get back to you with the next steps.